A. Routine inspection before stacker operation:

Routine inspections before the job have an absolute effect on the safety of the job on the day. Before operating your stacker, confirm that the stacker is in a safe state.

Before you check your stacker, please perform the following actions:

a. Stop the stacker at a safe and stable place b, stop the engine å’¿D, pull up the handbrake, and set all the control levers to the neutral position.

c. Let the mast be in a vertical position with the horizontal line. Put down the fork and let the fork come into contact with the ground.

Take a look around the stacker for leaks or leaks.

Check if the tire pressure is normal, if there is a cut on the tread, if the steel ring is deformed or damaged, and if the screws are locked.

Check if the rear supporter and fork are deformed, cracked, and the positioning of the fork is normal.

Check whether the tightness of the mast chain is the same.

Check if the lamp is damaged or if there is a deformed crack in the protective roof.

Open the hood and check the cooling water level. Check the engine oil level. Check the fan belt for cracks and wear. Check the battery electrolyte level. Check hydraulic oil level. Check the brake fluid level. Put down the hood, get in the car and sit on the seat. The seat is adjusted to the proper position. The steering wheel tilt angle is adjusted to the ideal position. Check if the speaker function is normal. Test whether the brake pedal is normal. Test whether the accelerator pedal is normal. Test whether the clutch pedal is normal. (Manual gear model) Test whether or not the jog pedal is normal. (Automatic gear model) Operation Handbrake lever is normal.

Turn the key switch ON and check that the amount of fuel oil is sufficient. Check whether each warning light and instrument function on the instrument panel is normal. Check if the direction light control lever is functioning properly. Check the brake light is working properly. Start the engine and let the engine warm up for 5 minutes. Check if there are abnormal sounds or abnormal vibrations. Check whether the mast is moving up and down, and whether it is smooth before and after, and check whether there is oil leakage in the hydraulic cylinder and the oil pipe. Slowly displace the stacker in a safe area. Check that the clutch action (inch switch action) is normal. Check if the brake braking force is sufficient. Check steering wheel steering is normal.

Second, regular inspection and maintenance Before operating the stacker, in addition to the need to perform first (the routine inspection before the job), the stacker for safety reasons, and to ensure the life of the parts, performance. Routine inspections of the stacker should be made at regular intervals.

a. When you encounter a problem, please discuss with your supervisor or technical staff and do not repair it yourself to ensure the safety of man-machine.

b. For more professional maintenance or maintenance projects, please submit them to technical personnel or trained professionals.

Hot Melt Adhesive For Paper Packaging

Shipping cartons must be able to withstand temperature, humidity changes and rough handling, but the use of tape is more difficult to meet this requirement, because of its poor bonding strength, low tensile strength, and for coated or oily cardboard is not strong.

The hot melt adhesive has a good bonding force with the wet material, strong penetration, and plays a physical and chemical bonding role between the corrugated paper and the lined paper board. The overall strength of the carton after bonding is enhanced, and the carton is not easy to deform and crack. In addition, the hot melt adhesive coating system can be applied to a variety of different shapes of the key parts, such as: carton folding lid.

Second, the low temperature resistance of the self-adhesive tape is poor, in the cold climate in the north, easy to open the glue; Hot melt adhesive has good low temperature resistance, can withstand -40℃ low temperature. Moreover, the storage period of hot melt adhesive is up to 2 years, the storage area is small, and there is no special storage requirements; The validity period of tape storage is only half a year, and certain storage conditions are also required, otherwise it is easy to deteriorate.

Hot melt adhesive also provides a good anti-theft function, as the adhesive penetrates into the corrugated, any attempt to open the carton will tear the fibers. The tape can be cut with a knife, unknowingly removing the contents and sealing them again.

Hot Melt Adhesive For Paper Packaging,Adhesive Hot Melt Glue,Hot Melt Glue Books Binding,Adhesive For Book Binding

Shenzhen Tongde New Materials Technology Co., Ltd. , https://www.tdhotmeltglue.com