aluminium profile glass door,aluminium profile glass doors,aluminium profile doors for kitchen,aluminum profile glass door Guangdong Huachang Group Co., Ltd. , https://www.jshcaluminum.com
First, the use of injection pump GZB-40C-type high-pressure injection pump for high-pressure rotary injection equipment, mainly for high-pressure rotary jet to provide high-pressure cement slurry. It is used to strengthen and reinforce weak foundations such as newly-built buildings, highways, high-speed railways, and underground railways, and is used for anti-seepage treatment around foundation pits, hydroelectric cofferdams, and dams for reservoirs.
Second, the characteristics of injection pump GZB-40C high-pressure injection pump is based on the original GZB-40A, GZB-40B gradually improved. Compared with similar products, its shaft-type transmission can avoid the sudden accident of the needle-type transmission, and the working life of the power end is extended; its thick crankshaft guarantees that no crankshaft breakage will occur; the hydraulic end is reasonable in structure and easy to disassemble. , The accessories are durable. It is a very mature and suitable high-pressure mud pump.
Third, the injection pump parameters plunger stroke: 100mm
Speed ​​ratio: 1=7.2545
Plunger punch times: 169 suction pipe diameter: 50mm
Outlet diameter: 16~25mm
Plunger diameter: 45, 50, 55mm
Output flow: 96, 99, 110L/Min
Rated pressure: 42, 40, 35Mpa (with 90kw motor)
35, 30, 28Mpa (with 75kw motor)
25, 22, 20Mpa (with 55kw motor)
Motor Model: YCT335-4C
Maximum motor speed: 1340r/Min
Dimensions: 3050*1800*1150mm
Total weight: 3000kg
The pressure grouting method of high-pressure injection pump refers to the use of hydraulic pressure to evenly inject the solidified slurry into the filling formation. The slurry fills, infiltrates, and compacts, etc. to drive off the moisture and air between the soil particles and then fill it. After a certain period of time, the slurry cements the loose soil particles into a whole, thereby strengthening the soil foundation and reducing post-construction settlement.