Pre- treatment:
1. Steel material : oil disposing and rust removing , phosphorization treatment
2. Aluminum : derosination and chromating treatment
* Test the pre- treatment in every two hours , testing methods should in comply with the drug supplier or according to user manual of our pre- treatment
Texture Powder Coating,Fine Texture Powder Coating,Wooden Texture Powder Coating,Sand Texture Powder Coating Longkou Guomei Decoration Material Co.,Ltd. , https://www.lkgmcoating.com
Lei Dajun, manager of Shiquan County Wanquan Water Supply Co., Ltd., said: “The intelligent charging system can reduce personnel costs, increase efficiency, and control the loss of water resources. Next, we will increase the input of human and material resources, and strive to fully complete the charges in one to two years. System intelligence, at the same time, integrate project funds, increase investment, and achieve upgrades for the pipe network, so that the people can drink reliable water, safe water, and ensure water.†With the advancement of intelligent automation of rural drinking water projects, water supply stability, drinking water safety The convenient service and payment are convenient for many water users. Longtang Township user Guo Qizhen is an early user of smart meter replacement for IC cards. In the past, he always used his own water metering and water supply protection. Nowadays, replacing a smart meter with an IC card and maintenance costs no money. A smart card can always be used. Prompt for water consumption and payment status.
Guo Qizhen told the author: "The installation of a smart charging system is good for us. The water is big and clean. You can pay for the money at any time. What's wrong? You can repair it in half an hour." The intelligent rural drinking water safety automation project in Shijiazhuang County has been strictly followed by the requirements of “water and water conservation†and urged the water supply companies to take service as the guide, water supply as the center, development as the main line, and management as the basis. Realize the management mode of rural towns' information intelligence and refined water supply.
Up to now, Shizhuang County Water Supply Station, Baisha Water Supply Station, Jufeng Water Supply Station, Longtang Water Supply Station, Pingdi Farm Water Supply Station and Ganxi Water Supply Station have started to implement six pilot townships, and more than 3,000 intelligent water meters have been replaced. . Completion of automatic pumping station renovation for 6 stations for supply of water in the cities of Fengxiang, Pingdi, Shigu, Longtang, Pingshan, and Jufeng, and steady progress in the intelligentization of drinking water safety automation in rural markets. It is expected to be completed by the end of 2017. The replacement of IC smart water meter and the transformation of aging water supply network.
[China Instrument Network Instrument Industry] In order to speed up the upgrade of rural drinking water projects and promote the win-win progress of drinking water management in towns, Guizhou Shiqi County invested more than RMB 7 million recently to launch an automated and intelligent rural drinking water safety project management system. Strive to use two years to complete the township township township location and surrounding village production automation, management intelligence. In recent years, with the gradual ageing of rural drinking water pipelines, water supply facilities, and toll systems, the lagging rural township drinking water system has not kept up with the pace of social development and cannot meet the needs of the masses in the towns and surrounding villages. Shiqi Wanquan Water Supply Co., Ltd., as the county's sole responsibility for the township water supply and drainage enterprises, boldly innovated in 2015 to upgrade and upgrade the water supply network and charging system of the towns and villages under its jurisdiction, and to provide water users with free replacement of IC smart water meters. In order not to affect the normal water consumption of the township water users, scattered and small-scale operations are used in the construction process to try to open up the peak period of mass water use.