Project Name: Phase II Construction Project of Jinjiang City, Ruijin City, Zhuozhou City Phase of Progress: Construction Preparation Construction Period: October 2011-December 2012 Major Equipment: Fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, lighting facilities ,crane.
Project Introduction:
The project is located in the northern section of Ruijiang City, Ganzhou City, Jiangxi Province. It has a residential development with a total construction area of ​​approximately 71,345 square meters. It consists of an 11-storey residential building, three 16-storey residential buildings and five 17-storey buildings. Residential building.
Total project investment: 90 million yuan.

Construction Unit: Ruijin (Kang Ju) Jinjiang City Construction Development Co., Ltd. Postal address: Xiangyi Town, Ruijin City, Ganzhou, China Postal Code: 342500
Contact: Ding Hao Telephone

Construction Unit: Fuzhou Habitat Construction Engineering Co., Ltd. Postal address: 5th Floor, Sun Plaza, 278 Hudong Road, Fuzhou, Fujian 3500000
Contact: Lin Xia Telephone

Related Developments: Tower Crane Infrastructure Project

Single Girder Suspension Crane

If you want to spare all the plant space for production,please choose our single girder Suspension Crane.The suspension crane can be directly installed on the roof of existing plants without brackets to save space and cost for customers. The running limit dimension for trolley of the electric suspension crane is small.The heavy object can be lifted to the position very close to the ground of plant.The running range of trolley will exceed the span of crane through the side jib.

Single Girder Suspension Crane,Single Girder Under Running Crane,Single Under Running Bridge Crane,Electric Single-girder Suspension Crane

EUROCRANE GLOBAL , https://www.eurocranepart.com